Case Study

Pedestrian Bridge

Dunkel
Case Study Filters

Install of a Pedestrian Bridge

MEI won a project to install a new pedestrian bridge at Lemmon Ave. on the Katy Trail. The bridge was installed in two sections, each measuring 52 feet long and weighing 18,000 lbs. Our team utilized a 60/80 Versa Lift and completed the project with assistance from our partner, Crocker Cranes.

The purpose of this new addition is to provide a safe pathway for both bikers and walkers. We’re honored to have been a part of this project and look forward to the community enjoying the bridge.